
GNPC Advances Voltaian Basin Exploration with TUA‑1X Well at Chegu
The Ghana National Petroleum Corporation and its subsidiary are moving from seismic studies to drilling, as construction of a 13.5‑km access road and rig pad begins at Chegu in the Mion District.





